Blueprints are done!!
I started drawing floor plans in September 2016.
Bought the land in December 2016.
Interviewed over 2 dozen timberframers.
Collected cost data for the entire project into a ridiculously large spreadsheet.
Collaborated with Downstream Construction in the design of a beautiful timberframe.
Modeled the entire thing in 3D.
Figured out how to turn that 3D model into 2D blueprints.
Had the
Bought the land in December 2016.
Interviewed over 2 dozen timberframers.
Collected cost data for the entire project into a ridiculously large spreadsheet.
Collaborated with Downstream Construction in the design of a beautiful timberframe.
Modeled the entire thing in 3D.
Figured out how to turn that 3D model into 2D blueprints.
Had the